Open Access
Table 3
Frequency of deformation monitoring
| Monitoring project | New railroad construction phase | Monitoring frequency |
|---|---|---|
| Vertical and horizontal displacement of subgrade; vertical and horizontal displacement of catenary columns (inclination); vertical and horizontal displacement of track | Before construction begins | Measure the initial value, and take the average value for not less than 10 consecutive times within 3 days |
| During construction | 4 times per day | |
| Within one month of completion | 1 time per two days | |
| One month after completion | Determine whether to continue observation according to whether the criteria for stopping measurement have been met |
Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.
Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.
Initial download of the metrics may take a while.
