Open Access
Issue
Wuhan Univ. J. Nat. Sci.
Volume 30, Number 4, August 2025
Page(s) 392 - 404
DOI https://doi.org/10.1051/wujns/2025304392
Published online 12 September 2025
  1. Wang J, Li H, Ma C, et al. Durability evaluation for existing railway engineering: A review[J]. Railway Sciences, 2024, 3(1): 59-68. [Google Scholar]
  2. Wang G H, Chen W H, Cao L G, et al. Retaining technology for deep foundation pit excavation adjacent to high-speed railways based on deformation control[J]. Frontiers in Earth Science, 2021, 9: 735315. [Google Scholar]
  3. Gou H Y, Yang L C, Leng D, et al. Effect of bridge lateral deformation on track geometry of high-speed railway[J]. Steel and Composite Structures, 2018, 29(2): 219-229. [Google Scholar]
  4. Qiu E X, Xie Q, Zhao W. Structure of the railway embankment settlement forewarning system and engineering application[J]. Hydrogeology & Engineering Geology, 2008, 35(5): 116-118, 123(Ch). [Google Scholar]
  5. Li J, Liu Y H, Zhang J R. Simultaneous measurement of strain and displacement for railway tunnel lining safety monitoring[J]. Sensors, 2024, 24(19): 6201. [Google Scholar]
  6. Yuan R, Cui X W, Lu M Q, et al. A GNSS multiantenna fast millimeter-level positioning method for rail track deformation monitoring[J]. IEEE Transactions on Instrumentation and Measurement, 2024, 73: 8503708. [Google Scholar]
  7. Tan Q L, Xie C. Preliminary result of permafrost roadbed settlement measurement using satellite D-InSAR technology[C]//Proceedings of the International Conference on Vibration, Structural Engineering and Measurement (ICVSEM 2011). Switzerland: Trans Tech Publications, 2012: 1912-1915. [Google Scholar]
  8. Li Y W, Xu L R, Chen Y H, et al. Intergrated space-air-train-ground Muti-source techniques for early detection of subgrade disasters and service status of railway subgrade[J]. Geomatics and Information Science of Wuhan University, 2024, 49(8): 1392-1406(Ch). [Google Scholar]
  9. Kampczyk A. Measurement of the geometric center of a turnout for the safety of railway infrastructure using MMS and total station[J]. Sensors, 2020, 20(16): 4467. [Google Scholar]
  10. Peixian W, Zhenan M A, Yanchong S U N. Research on data automation transmission of WinCE GTS-720 total station instrument based on GPRS[J]. Science of Surveying and Mapping, 2008, 33(6): 36-38(Ch). [Google Scholar]
  11. Jian L, Shan X C, Fei Y, et al. Development and Application of a Remote Monitoring and Analysis System for a High-Speed Railway Subgrade Structure in Mountainous Areas[M]. Beijing: China Railway Publishing House, 2015(Ch). [Google Scholar]
  12. Wei H Y. Application of big data analysis and mathematical models in civil and structural engineering[C]//Proceeding of the 2024 5th International Conference on Computer Science and Management Technology. New York: ACM, 2025: 1252-1257. [Google Scholar]

Current usage metrics show cumulative count of Article Views (full-text article views including HTML views, PDF and ePub downloads, according to the available data) and Abstracts Views on Vision4Press platform.

Data correspond to usage on the plateform after 2015. The current usage metrics is available 48-96 hours after online publication and is updated daily on week days.

Initial download of the metrics may take a while.